Technology rollouts, owned past go-live.

Installation is one day on site. Deployment is everything that makes that day work, and everything after it. We plan, stage, install, and validate your technology at every location, then keep it running.

Talk to PGT →
Products

What we deploy

Networking

Switches, routers, firewalls, and SD-WAN edge devices, configured to standard before they ship.

WiFi

Surveys, access point installation, and post-install validation, indoor and outdoor.

Voice

Phones, UCaaS endpoints, and number porting, cut over during your off-hours.

Structured cabling and design

BICSI-certified installation, testing, and labeling.

Security and surveillance

IP cameras, access control, and managed firewalls.

In-store technology

Registers, payment terminals, speakers, and the other endpoints your sites run on.

Aisle of storage racks in a distribution warehouse
The process

How a rollout runs

  1. 1

    Plan

    Site surveys, scope, schedule, and a standard build for every location type. Pilot sites go first, so the lessons carry into every wave after.

  2. 2

    Stage

    Equipment is procured, configured, and asset-tagged before it ships. Technicians arrive to install, not troubleshoot.

  3. 3

    Ship

    Each kit reaches its site on schedule, matched to the install date and the technician.

  4. 4

    Install

    On-site technical leads and field technicians work from one scope and one checklist, scheduled around your operating hours.

  5. 5

    Cut over

    Circuits, phones, and network go live in a set window, with a rollback plan ready.

  6. 6

    Test and validate

    Every site is tested against the design and closed out with photos and as-built documentation.

The difference

Why PGT for deployment

Most rollouts are split between a project manager, a staging vendor, local installers, and the carriers. Every gap between them becomes a missed date at one of your sites. We run all of it: 5,000 field technicians, on-site technical leads, and PMP-certified project managers who own the schedule and chase every carrier turn-up.

When a site passes validation, it moves into PGT Managed Services with its documentation and configurations, so our Network Operations Center monitors it from day one. No new vendor, no handoff.

A PGT field technician on site in a hard hat and safety glasses
Environments

Multi-site rollouts across demanding industries

Quick-serve restaurants. Retail. Healthcare. Senior living. Logistics and distribution. Installs run after hours and around your operating schedule, so locations open on time.

  • 105 senior living communities in 30 days:

    firewall upgrades and ongoing management of every device

  • 400-store national retailer in 16 weeks:

    registers, phones, payment terminals, and APs replaced across two visits per store

  • 27 distribution centers in 4 weeks:

    790 access points installed

Planning a rollout?

Tell us how many sites and what’s going in. We’ll come back with a plan, a timeline, and what to expect.